May 12, 2025. Monday Momentum. Progress. Perform. Protect. Page 1. Photos with the caption:  Pedestrian pad is the main location for parents to drop off and pick up middle school students by car.

The new parking lot is officially operational and the next construction zone has been closed off. We thank everyone for their patience and understanding through these adjustments.

May 12, 2025. Monday Momentum. Progress. Perform. Protect. Page 2. Photos with the caption: Pedestrian pad is the main location for parents to drop off and pick up middle school students by car.May 12, 2025. Monday Momentum. Progress. Perform. Protect. Page 3. Photos with the caption: Construction zone has taken over, closed the old parking lot between the middle school and high school. Sidewalks remain open.May 12, 2025. Monday Momentum. Progress. Perform. Protect. Page 4. Photos with the caption: Driveway connecting ECLC and the front of the middle school and high school is also closed.