May 19, 2025. Monday Momentum. Progress. Perform. Protect. Page 1. Photos with the caption:  Most recent design images for the exterior of Kirksville High School have been released.

The most up-to-date design images for the new front entrance of Kirksville High School have been released by architects from Building Resource Studio. Ground has also been broken for the new Performing Arts Center for Education. Students from our Early Childhood Learning Center are enjoying watching the construction next door—and they’re doing some building of their own! Thank you, ECLC, for sharing the photos.

May 19, 2025. Monday Momentum. Progress. Perform. Protect. Page 2. Photos with the caption: Ground is broken; dirt is flying.May 19, 2025. Monday Momentum. Progress. Perform. Protect. Page 3. Photo with ECLC students playing with toy equipment and construction crew working in the background.May 19, 2025. Monday Momentum. Progress. Perform. Protect. Page 4. Photos with the Photos with ECLC students playing with toy equipment and construction crew working in the background.